|
|
Map of the area that we
salvaged.
|
The section of trackage
we removed from the Lehigh Valley made way for a ‘Rails to Trails’ project. This
project was paid for with TEA-21 (Federal) Transportation Enhancement Funding.
|
|
|
There are some rails in
there… somewhere…
|
A lot of elbow grease was
involved…
|
|
|
|
|
|
|
A front-end loader comes
in handy.
|
A wheel from a speeder that
we found…
|
|
|
|
Cutting apart a switch track
down to its components.
|
|
|
Take out the spikes, clamp
on, lift it up!
|
|
|
|
The last stack of rail…
|
… in easy to swallow 39-foot
lengths!
|